Date : 26 to 28 March 2015 to Present
Operation Performed : Steel Structures Rafter Joints Inspection Wood Factory Construction (MT)
Client : PECI (Myanmar) & MOS Lumber Co.,Ltd.
View JobDate : 24 Feb to 18 Mar 2015
Operation Performed : Pipe Pile Splicing Joint Inspection, Pansodan Jetty Construction Site(UT)
Client : J &M, Capital, & Triangle Links Co.,Ltd
View JobDate : 5th Feb 2015
Operation Performed : Sedona Hotel Expansion Project, Chilled Water Pipes Joints (MT)
Client : Pyae Sone Engineering Pte Ltd. & WH RTO
View JobDate : 21st to 27th Jan 2015
Operation Performed : Triangle Links Engineering
Client : Myay Ni Gone Fly Over Steel Plate Girder Joints (UT)
View JobDate : 3rd Jan 2015
Operation Performed : Myanma Port Authority, Mechanical Department
Client : Marine Engine Parts Inspection (Yadana Theinkha) (MT,PT)
View JobDate : 29 Dec 2014 & Jan 2015
Operation Performed : Welded Steel Tanks Joint Inspection (RT & UT,PT)
Client : Triangle Links Engineering Co., Ltd. & CNQC Surveyor
View JobDate : 26 Dec 2014
Operation Performed : Steel Bridge Girder Joint Inspection (MT)
Client : May Modern Construction Co., Ltd.
View JobDate : 16 Dec 2014
Operation Performed : MANN AUNG Vessel, Hull Plate Inspection (UT)
Client : Myanma Five Star Line & Class NK Surveyor
View Job